Author Archives: Amanda

One room at a time!

By | January 9, 2013

It has been “go” here since Christmas.  With a few quiet weeks of work, our plan has been to get as much done as possible.  Always tricky to juggle the Xmas social commitments with boat building, and the hot weather, but we are finally feeling like we are making progress. We have been filling and… Read More: One room at a time! »

As we speak …

By | December 17, 2012

Cupboard doors being installed throughout boat as we speak and upholstery being installed tomorrow morning … these are the exciting parts!!

Benchtops being fitted!

By | December 3, 2012

So exciting … benchtops installed today, finishing happening Wednesday.  Upholstery started today and cupboard doors & catches being fitted this week too. Can’t wait for Friday’s pics!!

Christmas is coming!

By | November 28, 2012

Wiring and ceiling panels have dominated the last month.  Longer days have meant even more aching muscles but so much more getting done with daylight saving here now.  Our ceiling panels are going to look great but wonky ply has caused some grief with panels changing shape almost daily depending on the weather conditions.  They… Read More: Christmas is coming! »

Hey Joe!

By | November 24, 2012

Our blog is usually followed by those interested in boats but we recently received an email from Joe who came across us while searching bossa nova music on the web. Thanks Joe for your email!  … and we have added a link to you playing the ‘The Girl From Ipanema’! (See “You Tube – Girl… Read More: Hey Joe! »

Full on …

By | October 28, 2012

Sometimes you work on the boat for days and seem to see little progress. Fortunately the last 10 days or so have NOT been like that! We seem to have kicked lots of goals with a second motor dropped in and hooked up, the ceiling lining ply well under way, and the shiny stainless pullpits… Read More: Full on … »

Time for an update …

By | September 25, 2012

It’s full on now.  Every spare hour of every spare day.  If we want to make January our launch month, it’s full steam ahead. Our outside fairing is very close, our upholstery all confirmed and ordered, bench tops measured with templates completed ready for our cabinet man, galley carcasses in with doors being sprayed as… Read More: Time for an update … »

Two loos in …

By | August 25, 2012

I suppose the second toilet was never going to be quite so exciting and was a challenge to bolt down as we couldn’t reach the locking gadgets but in the end we fabricated some alternative fiberglass brackets which are out of sight and working well? The hardest part about fitting the main fridge was probably… Read More: Two loos in … »

Another Boat Show!

By | August 13, 2012

Just got back from the Sydney Boat Show.  The usual list of things to see, measure and price.  This is (hopefully) the last of the big shows before we launch so we thought it was an opportunity to check some details and look for a few things we hadn’t made decisions on … and two… Read More: Another Boat Show! »

Freezer in …

By | July 16, 2012

Installed the freezer unit yesterday (not plumbed in yet) … a big shiney bit!  We have a separate freezer in the starboard hull for long distance cruising with a fridge/freezer in the galley for everyday use.

Cockpit windows going in

By | July 16, 2012

Fitted the two electric windows yesterday. Designed these with the companion-way door frame.  All aluminium with white powder-coated surface.  Had them for ages so very exciting to finally start fitting them.  And they are electric!

Let’s Spend The Night Together … 50 years of the Stones!

By | July 12, 2012

What’s this got to do with boat building??? Heard today that we are celebrating 50 years of the Rolling Stones.  So I thought I’d mark the occasion by mentioning a great album I bought a few months back called Bossa N’ Stones.  A collection of great renditions of Stones classics in bossa nova style!  Smooth and… Read More: Let’s Spend The Night Together … 50 years of the… »

The heat is on!

By | July 11, 2012

While the weather has been COLD we have kept at it … with the latest ETL (estimated time of launch) being January, the “heat is on!”   Jumping out of bed early morning hasn’t been that easy but once inside the boat with the heater on it has been rather cosy.  We’ve been having 2 degree nights… Read More: The heat is on! »

It’s all happening today …

By | April 18, 2012

Action everywhere today.  Cabinet-maker here to fine tune the measurements, Mick our ‘fairer’ here, and Wayne our window man here.  Love it!! Windows are completely in (look great) with the black Simsons completed as well … shmick!! Gilbert our cabinet man, here as well.  Bathroom benches made, trimmed and completed,and our ‘cubby-hole’ features trimmed &… Read More: It’s all happening today … »

Windows going in …

By | April 2, 2012

Sunny day, cold weather approaching, time for the windows to go in. We started last week preparing the fibreglass, with four ready, we started on the glass today.  

Sunshine …

By | March 19, 2012

It’s a beautiful day here … 25 degrees, not a cloud in the sky, no breeze, just sunshine.  Some days the weather can reflect the mood.  Today, we feel we are making progress and the sun is shining.  Mick, our fabulous ‘fairer’, our fibreglass master, has added some shine to the bogged and gelcoated white. … Read More: Sunshine … »

6 days straight …

By | March 12, 2012

Jobs done … helm pilot hatch, bathroom ceiling, rudder reference control in port engine locker, gas bottle shelf/locker, galley furniture, rear beam join in back locker, dinghy davits, auto-pilot cabling, second engine bilge pump … Is he going crazzzzyyyy????  See pic number 8!!

Fairing continues …

By | February 14, 2012

Still working on the fairing of the outside of our boat, inside will come next.  While Mick, our fairer, continues to bog, sand & polish, Neville has been working on the conversion of the cockpit locker to an icebox.  Mick will add the finishing fibreglass, then Neville will add some insulation.  This is a ‘work… Read More: Fairing continues … »

Outside fairing has begun!

By | February 8, 2012

Dry weather, mild temperatures, it’s fairing time.  We’ve finally found someone to fair our boat.  Mick is working on the outside while the weather is fine.  Lots (and lots) of bogging and then sanding, with spraying starting today. We’ve also started adding the two underfloor ribs.  One on today, prep done for the other.  Not… Read More: Outside fairing has begun! »

Bits and pieces …

By | January 9, 2012

More fibreglassing of shelves and saloon couch, batons in the ceiling of the bathroom ready for the ceiling, fitting of a bilge pump to the port hull, pre-plumbing of two toilets, galley bench, laying up of small sections of our existing moulds to use as trim here and there …. the list goes on!  

Fairing has started …

By | November 28, 2011

The last few weeks have been all about getting all the inside ‘shiny-sheet’ bits and pieces completed, particularly around the doorways.  We’ve cut out the internal doorways now and measured for our aluminium trims.  We are using the same company who have made our external doorway and windows.  The external door & windows are powder… Read More: Fairing has started … »

It’s Sunday …

By | October 9, 2011

Sunday is clean-up day, well, it’s supposed to be.  Neville is good at the mess, so I suppose I compliment him by being better at the cleaning up.  We can now see the saloon and the ‘couch’ furniture as I’ve ‘cleaned up’ this area this afternoon.  I can’t really help ‘hands on’ with many jobs… Read More: It’s Sunday … »

Our saloon …

By | September 23, 2011

Really looking forward to the saloon coming together.  We have put a lot of thought in to this area.  Our initial thoughts were to have a galley down (like our Seawind 1000) – more entertaining room up and utilise the hull space down. After much discussion, measuring and researching designs on other cats, we decided… Read More: Our saloon … »

Winter Update

By | June 27, 2011

I’ve learn’t so much during this build, especially working with fibreglass.  Making the furniture pieces has been very rewarding.  Finding ways to make white shapes and then piecing the made pieces together to make the corners, walls, steps and cupboards has been tedious but very rewarding. Just had a ‘week away’ escaping the cold and… Read More: Winter Update »

And you thought …

By | April 11, 2011

And you thought … nothing was happening.  Lots happening, including lots of thinking.  While we have purchased many interior furniture components from Fusion Mackay, we didn’t purchase the galley and saloon components.  So we are designing and building these ourselves.  Neville is busy learning ‘how to’ work with fibreglass and I just find the glossy… Read More: And you thought … »

A pause …

By | March 7, 2011

It’s been 6 weeks since we started building.  So much done … so much more to do.  Long days, many hours, kilos of resin, kilos of glue, metres of fibreglass, hundreds of plastic buckets and white rags, and endless hours of grinding (teeth too).  Not to mention the endless number of coffees, lunches and cold… Read More: A pause … »

Day 21 …

By | February 9, 2011

Just 21 days … stunning progress so far… the kit is basically complete but it was always our intention to fit a large number  of moulded furniture components (from Fusion Mackay) and the installation of these has started as you can see from the pics. Fusion Mackay sell these components and we’ve had two of… Read More: Day 21 … »

12 Days Straight ..

By | January 28, 2011

A few more assembly pics. The starboard and port sides have been added, furniture components have been placed waiting for fixing next week when Dodge from Fusion Mackay joins us.

Day 10 …

By | January 28, 2011

The days have flown by and there’s been so much progress.  We have a boat in our paddock! Lots still to do but so much progress in a short time. A big thankyou to guys who have been working with Neville … Tom from Fusion Mackay who’s our “expert”, Trevor, who’s pretty good at everything… Read More: Day 10 … »

Parts arriving …

By | September 22, 2010

“Isn’t it gorgeous!” Hmmm … WHAT is he talking about?  He was talking about the forebeam. The forebeam has arrived … and the two engine beds.

Getting ready for delivery

By | August 31, 2010

Not much to show so far with the Fusion Kit delayed.  With such a wet winter and another ‘small’ building project taking up considerable time (not to mention work), the delay has meant more time for preparation.  Every night (no joke) Neville studies his “Master List”.  “Nearly everything crossed off,” he told me the other… Read More: Getting ready for delivery »