Timber …

By | March 5, 2013

Our floors inside are nearly complete.  The galley and our starboard steps are happening as I type.  After a hectic few days tracking down some silver ash we are back on track.  Lesson learned … order plenty in the first place! The cockpit ice-box is ready for some ‘coving’ (Amanda’s forte) and then some floor… Read More: Timber … »

Trims & icebox

By | February 26, 2013

We have designed vinyl trims that cover the gap between the overhead ply vinyl panels and hull fibreglass … and they work!  The concern was that we needed them to be removable because various bolts are under them.  Must always plan for leaks!  So using ‘decorative’ stainless bolts, making them a feature, we have attached… Read More: Trims & icebox »

Vrooom …..

By | February 19, 2013

How exciting!…We actually started the motors today. With plastic tubs to represent the water we hope to float on, and 20 litres of fuel in each tank the man from Yanmar hit the key and the port motor immediately roared into life. a few nervous moments and a bit of priming saw the cooling water… Read More: Vrooom ….. »

Ceiling and floors

By | February 1, 2013

Our ceiling panels, bedheads and upholstery are all completed.  All looking great.  Teak trims hopefully added this week.  Teak floors completed in the hulls, with the saloon next.  A lot of grinding to prepare the floor this weekend.  Every time I think I’ve seen the last of grinding, there’s yet another job.  An awful job! … Read More: Ceiling and floors »

One room at a time!

By | January 9, 2013

It has been “go” here since Christmas.  With a few quiet weeks of work, our plan has been to get as much done as possible.  Always tricky to juggle the Xmas social commitments with boat building, and the hot weather, but we are finally feeling like we are making progress. We have been filling and… Read More: One room at a time! »

As we speak …

By | December 17, 2012

Cupboard doors being installed throughout boat as we speak and upholstery being installed tomorrow morning … these are the exciting parts!!

Benchtops being fitted!

By | December 3, 2012

So exciting … benchtops installed today, finishing happening Wednesday.  Upholstery started today and cupboard doors & catches being fitted this week too. Can’t wait for Friday’s pics!!

Christmas is coming!

By | November 28, 2012

Wiring and ceiling panels have dominated the last month.  Longer days have meant even more aching muscles but so much more getting done with daylight saving here now.  Our ceiling panels are going to look great but wonky ply has caused some grief with panels changing shape almost daily depending on the weather conditions.  They… Read More: Christmas is coming! »

Hey Joe!

By | November 24, 2012

Our blog is usually followed by those interested in boats but we recently received an email from Joe who came across us while searching bossa nova music on the web. Thanks Joe for your email!  … and we have added a link to you playing the ‘The Girl From Ipanema’! (See “You Tube – Girl… Read More: Hey Joe! »

Full on …

By | October 28, 2012

Sometimes you work on the boat for days and seem to see little progress. Fortunately the last 10 days or so have NOT been like that! We seem to have kicked lots of goals with a second motor dropped in and hooked up, the ceiling lining ply well under way, and the shiny stainless pullpits… Read More: Full on … »

The detail …

By | September 30, 2012

So much to wire up, so little time … I have just spent the weekend roughing in most (not all) of the wiring for the fourteen pumps, six tank senders, fifty odd light fittings and numerous other items such as the anchor winch that arrived this week. Even that included the need for heavy cable… Read More: The detail … »

Time for an update …

By | September 25, 2012

It’s full on now.  Every spare hour of every spare day.  If we want to make January our launch month, it’s full steam ahead. Our outside fairing is very close, our upholstery all confirmed and ordered, bench tops measured with templates completed ready for our cabinet man, galley carcasses in with doors being sprayed as… Read More: Time for an update … »

Two loos in …

By | August 25, 2012

I suppose the second toilet was never going to be quite so exciting and was a challenge to bolt down as we couldn’t reach the locking gadgets but in the end we fabricated some alternative fiberglass brackets which are out of sight and working well? The hardest part about fitting the main fridge was probably… Read More: Two loos in … »

Another Boat Show!

By | August 13, 2012

Just got back from the Sydney Boat Show.  The usual list of things to see, measure and price.  This is (hopefully) the last of the big shows before we launch so we thought it was an opportunity to check some details and look for a few things we hadn’t made decisions on … and two… Read More: Another Boat Show! »

Freezer in …

By | July 16, 2012

Installed the freezer unit yesterday (not plumbed in yet) … a big shiney bit!  We have a separate freezer in the starboard hull for long distance cruising with a fridge/freezer in the galley for everyday use.

Cockpit windows going in

By | July 16, 2012

Fitted the two electric windows yesterday. Designed these with the companion-way door frame.  All aluminium with white powder-coated surface.  Had them for ages so very exciting to finally start fitting them.  And they are electric!

Let’s Spend The Night Together … 50 years of the Stones!

By | July 12, 2012

What’s this got to do with boat building??? Heard today that we are celebrating 50 years of the Rolling Stones.  So I thought I’d mark the occasion by mentioning a great album I bought a few months back called Bossa N’ Stones.  A collection of great renditions of Stones classics in bossa nova style!  Smooth and… Read More: Let’s Spend The Night Together … 50 years of the… »

The heat is on!

By | July 11, 2012

While the weather has been COLD we have kept at it … with the latest ETL (estimated time of launch) being January, the “heat is on!”   Jumping out of bed early morning hasn’t been that easy but once inside the boat with the heater on it has been rather cosy.  We’ve been having 2 degree nights… Read More: The heat is on! »

Still here!

By | May 9, 2012

You may be wondering where we’ve gone but we’re still here! The devil, as they say is in the detail. The wine rack is finally cut out in black perspex and ready to fit just as soon as the dust stops (you’ll have to wait that pic). Our ‘glove box’ style cubby holes under the… Read More: Still here! »

It’s all happening today …

By | April 18, 2012

Action everywhere today.  Cabinet-maker here to fine tune the measurements, Mick our ‘fairer’ here, and Wayne our window man here.  Love it!! Windows are completely in (look great) with the black Simsons completed as well … shmick!! Gilbert our cabinet man, here as well.  Bathroom benches made, trimmed and completed,and our ‘cubby-hole’ features trimmed &… Read More: It’s all happening today … »

Windows going in …

By | April 2, 2012

Sunny day, cold weather approaching, time for the windows to go in. We started last week preparing the fibreglass, with four ready, we started on the glass today.  

Sunshine …

By | March 19, 2012

It’s a beautiful day here … 25 degrees, not a cloud in the sky, no breeze, just sunshine.  Some days the weather can reflect the mood.  Today, we feel we are making progress and the sun is shining.  Mick, our fabulous ‘fairer’, our fibreglass master, has added some shine to the bogged and gelcoated white. … Read More: Sunshine … »

6 days straight …

By | March 12, 2012

Jobs done … helm pilot hatch, bathroom ceiling, rudder reference control in port engine locker, gas bottle shelf/locker, galley furniture, rear beam join in back locker, dinghy davits, auto-pilot cabling, second engine bilge pump … Is he going crazzzzyyyy????  See pic number 8!!

Port Hull Update …

By | March 9, 2012

Our internal door frames have arrived!  Anodized aluminium complete with trim rings which we hope will look really classy! They should be a lot less work also but there will be a tedious bit of fibreglass adjustment required. Most of the bulkheads are now trimmed out but some of the adjoining furniture needs to be… Read More: Port Hull Update … »

Rubber Man!

By | March 9, 2012

There’s so many confined spaces on a boat.  Squeezing in to the cockpit stern seats to complete the fibreglass and then flow-coat, accessing the tall cupboards with only one arm fitting through the opening to flow-coat while trying not to paint the rubber hoses and then watching Neville build the gas bottle shelf in the… Read More: Rubber Man! »

Toothbrushes …

By | February 21, 2012

Sunday is clean-up day, the cockpit the target.  With acetone, a new yellow gunk (can’t remember its name) and even a toothbrush, Amanda washed, scrubbed, re-scrubbed and used her toothbrush to restore the whiteness to our very messy cockpit.  I remember when we bought our Seawind noticing a toothbrush with the cleaning implements … I… Read More: Toothbrushes … »

Fairing continues …

By | February 14, 2012

Still working on the fairing of the outside of our boat, inside will come next.  While Mick, our fairer, continues to bog, sand & polish, Neville has been working on the conversion of the cockpit locker to an icebox.  Mick will add the finishing fibreglass, then Neville will add some insulation.  This is a ‘work… Read More: Fairing continues … »

Outside fairing has begun!

By | February 8, 2012

Dry weather, mild temperatures, it’s fairing time.  We’ve finally found someone to fair our boat.  Mick is working on the outside while the weather is fine.  Lots (and lots) of bogging and then sanding, with spraying starting today. We’ve also started adding the two underfloor ribs.  One on today, prep done for the other.  Not… Read More: Outside fairing has begun! »